What the buyer wrote
In light of updates to the development to be included in the South Tyneside Local Plan, an update to the Highways England Infrastructure Study (which identifies the schemes which are required on the trunk road network and when within the Plan period) is required.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- South Tyneside Infrastructure Study
- How they are buying
- Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
- Type
- services
- Work starts
- 17 May 2018
- Work ends
- 29 Mar 2019
- Kind of work
- Building surveying and inspection
Who the buyer named
The buyer published a contact address on this notice.
