Skip to the main content
The Crier

Spigot Repair Works - Liverpool Cruise Liner Terminal

Your saved contracts

What the buyer wrote

The successful contractor will be required to undertake the refurbishment of the steel spigots that are located within the four interconnected reinforced concrete pontoons that provide the dampening mechanism to the pontoons when there is a sea swell, tidal surge or wave movement to reduce the vertical and lateral movement enabling a more stable platform (berth) to carry out cruise operations at the Liverpool Cruise Liner Terminal. The maintenance inspections carried out identified that major repair /refurbishment works are required as the steel spigot hinges and the nuts and bolts that secure the spigot to the concrete face of the pontoons have fractured or come loose. Currently temporary m…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

John Sisk & Son (Holdings) Limited£1.2mends (31 Oct 2017)

Details

What the buyer calls it
Spigot Repair Works - Liverpool Cruise Liner Terminal
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
1 Jan 2017
Work ends
31 Oct 2017

Who the buyer named

Greg Nixon was the named contact on this notice.

greg.nixon@liverpool.gov.uk