Spigot Repair Works - Liverpool Cruise Liner Terminal
What the buyer wrote
The successful contractor will be required to undertake the refurbishment of the steel spigots that are located within the four interconnected reinforced concrete pontoons that provide the dampening mechanism to the pontoons when there is a sea swell, tidal surge or wave movement to reduce the vertical and lateral movement enabling a more stable platform (berth) to carry out cruise operations at the Liverpool Cruise Liner Terminal. The maintenance inspections carried out identified that major repair /refurbishment works are required as the steel spigot hinges and the nuts and bolts that secure the spigot to the concrete face of the pontoons have fractured or come loose. Currently temporary m…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Spigot Repair Works - Liverpool Cruise Liner Terminal
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Jan 2017
- Work ends
- 31 Oct 2017
- Kind of work
- Refurbishment and fit-out
Who the buyer named
Greg Nixon was the named contact on this notice.
