Skip to the main content
The Crier

Sports Centre Changing Room Refurbishment incl Lockers and Furniture: supply, installation and maintenance of

Your saved contracts

What the buyer wrote

The contractor will be required to remove the current locker systems, benching and changing cubicles from the University’s Sports Centre Changing rooms, and replace with new Installation is required in December 2016. The Sports Centre is to remain operational throughout the refurbishment period, therefore contractors should work on the basis that the university has a preference for one changing room to be operational at all times. Contractors’ proposals will optimise the space available for storage, and will be aesthetically versatile. There is no predetermined or specific requirement in terms of size or number of lockers to be installed As a minimum the contractor will provide …

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Flexit FF&E Solutions£28.4kends (31 Dec 2021)

Details

What the buyer calls it
Sports Centre Changing Room Refurbishment incl Lockers and Furniture: supply, installation and maintenance of
How they are buying
The buyer did not say
Suitable for small firms
The buyer says yes. What that is worth
Work starts
1 Nov 2016
Work ends
31 Dec 2021

Who the buyer named

Mark Hayter was the named contact on this notice.

m.hayter@leedstrinity.ac.uk