Sports Centre Changing Room Refurbishment incl Lockers and Furniture: supply, installation and maintenance of
What the buyer wrote
The contractor will be required to remove the current locker systems, benching and changing cubicles from the University’s Sports Centre Changing rooms, and replace with new Installation is required in December 2016. The Sports Centre is to remain operational throughout the refurbishment period, therefore contractors should work on the basis that the university has a preference for one changing room to be operational at all times. Contractors’ proposals will optimise the space available for storage, and will be aesthetically versatile. There is no predetermined or specific requirement in terms of size or number of lockers to be installed As a minimum the contractor will provide …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Sports Centre Changing Room Refurbishment incl Lockers and Furniture: supply, installation and maintenance of
- How they are buying
- The buyer did not say
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Nov 2016
- Work ends
- 31 Dec 2021
Who the buyer named
Mark Hayter was the named contact on this notice.
