Skip to the main content
The Crier

SPS00891 - Provision of Anchorage Designer for Union Chain Bridge

Your saved contracts

What the buyer wrote

The Geotechnical Designer is to design required ground anchorage system and provide drawings, construction Methodology, sequencing and Risk Assessments. The Contract has been split into two stages; this is due to the works being part funded by the Heritage Lottery, The Client is currently in the development stage or Stage One of the works, it is during this development phase that all design work needs to be completed in preparation of the Stage II HLF Bid application in March 2019. Assuming that this bid is successful then the Client will give instruction to proceed to the Stage Two elements of work. Full tender documents available from https://procontract.due-north.com

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Remedy Geotechnics Limited£58.7kends (26 Aug 2021)

Details

What the buyer calls it
SPS00891 - Provision of Anchorage Designer for Union Chain Bridge
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
21 Sep 2018
Work ends
26 Aug 2021

Who the buyer named

Kerry Davidson was the named contact on this notice.

kerry.davidson@northumberland.gov.uk