SPS00891 - Provision of Anchorage Designer for Union Chain Bridge
What the buyer wrote
The Geotechnical Designer is to design required ground anchorage system and provide drawings, construction Methodology, sequencing and Risk Assessments. The Contract has been split into two stages; this is due to the works being part funded by the Heritage Lottery, The Client is currently in the development stage or Stage One of the works, it is during this development phase that all design work needs to be completed in preparation of the Stage II HLF Bid application in March 2019. Assuming that this bid is successful then the Client will give instruction to proceed to the Stage Two elements of work. Full tender documents available from https://procontract.due-north.com
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- SPS00891 - Provision of Anchorage Designer for Union Chain Bridge
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 21 Sep 2018
- Work ends
- 26 Aug 2021
Who the buyer named
Kerry Davidson was the named contact on this notice.
