The Council is seeking to procure a Contractor under an NEC3 ECC (Design and Build) Contract for the construction of a new section of Road that links St. Austell to the A30 via the China Clay area. The Contractor will be expected to take a pre- planning reference design and produce a detailed design as well as undertaking the subsequent construction of the road. The preferred route will be 6.2 kilometres in length and will comprise a 10m wide single carriageway designed to a 60 mph design speed with climbing lanes on steeper gradient sections. The route requires 42.8 hectares of land for construction and total scheme cost is estimated at £60 million. Suppliers can access and download …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- St Austell A30 Link Road
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 29 Jul 2019
- Work ends
- 31 May 2023
- Kind of work
- New build construction