St John at Hackney Project - Quantity Surveying - HG-13-08579
What the buyer wrote
St John at Hackney wishes to engage a suitably qualified Quantity Surveyor for two phases of work required. The Quantity Surveyor will be required to work alongside The Client, the project manager and appointed Design Team to take the scheme through to the successful handover; covering the Royal Institute of British Architects stages of work 2 (Concept Design) to 7 (In Use) and delivering the services and outputs as set out by the RICS Quantity Surveyor Services. Part 1: Development Phase The Quantity Surveyor working alongside the Client, project manager and the multi-disciplinary design team will assist St John at Hackney in preparation for its second round application to the Heritage Lo…
Details
- What the buyer calls it
- St John at Hackney Project - Quantity Surveying - HG-13-08579
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 9 Nov 2015
- Work ends
- 1 Sep 2016
Who the buyer named
The Project Manager was the named contact on this notice.
