What the buyer wrote
A 4,200 square metre building for science, technology, engineering and mathematics (STEM) is being built at the University's Markeaton Street site. The centre, which is expected to be completed by 2017, will focus on real-world learning, combining functional teaching space with infrastructure designed for the specific needs of engineering and computing. The College of Engineering and Technology, University of Derby is expanding in to the field of composite materials. A laboratory requires a composites autoclave system, capable of processing parts and materials which require exposure to elevated pressure and temperature. Additional information: Is a Recurrent Procurement Type? : No
Details
- What the buyer calls it
- STEM - Composites Autoclave
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Work starts
- 2 Apr 2017
- Work ends
- 28 Jul 2017
- Kind of work
- Health and social care
Who the buyer named
Roshani McLaughlin was the named contact on this notice.
