What the buyer wrote
The objective of this requirement is to provide preliminary design for the waveguide diameter and corrugations for the Transmission Line (TL) that maximises the power transmission and mode purity over the frequency spectrum used for the STEP Heating and Current Drive (HCD) system For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Abingdon:-Technical-testing%2C-analysis-and-consultancy-services./X46Z2W999V To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/X46Z2W999V
Details
- What the buyer calls it
- STEP HCD Transmission Line Waveguide
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
Who the buyer named
Operational Procurement was the named contact on this notice. Questions closed on 21 Nov 2025, 15:00 GMT.
