STEP P&T – High Heat Flux Testing and Verification Facility
What the buyer wrote
An integrated system that will provide cooling for the high heat flux testing for the STEP in-vessel components, as well as cooling the auxiliary systems required for operation, as part of the High Heat Flux Testing and Verification Facility. This system will include: Temperature Control Unit (226 kW cooling capacity, 150 kW heating capacity and a maximum operating temperature of 350°C) Chiller (350 kW cooling capacity) Design of the Temperature Control Unit and Chiller System, along with all necessary components for operation. Commissioning of the system. Installation of the system. This system is very similar to the operational HIVE test rig which has used this supplier for the l…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- STEP P&T – High Heat Flux Testing and Verification Facility
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Work starts
- 30 Oct 2025
- Work ends
- 31 Mar 2026
- Where
- in the South East
Who the buyer named
Operational Procurement was the named contact on this notice.
