STEP WP5 - Heat Pipe Design Challenge
What the buyer wrote
Managing the heat exhaust from a fusion reactor is one of the most pressing challenges facing those seeking to realise a commercial power plant design For spherical tokamak designs such as STEP, the compact nature of the device potentially increases the heat fluxes on the plasma-facing components and restricts the space for incorporating cooling when compared to conventional larger aspect-ratio tokamaks such as ITER or EU-DEMO. A fusion reactor heat exhaust is handled via a divertor, which needs to handle large heat fluxes (>10 MW.m-2) especially in the divertor target 2Heat pipes have been proposed as potential technology for fusion high heat flux components since at least 1972. Li…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- STEP WP5 - Heat Pipe Design Challenge
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 15 Nov 2019
- Work ends
- 28 Feb 2020
Who the buyer named
Andy Kynaston was the named contact on this notice.
