STEP WP9 Task 1 - Waste Sisposal and Decommissioning Optioneering

Your saved contracts

What the buyer wrote

UKAEA wishes to initiate a contract to explore the processing, disposal and recycling solutions for waste materials that are likely to be generated during the nuclear operation of a STEP device. This will build upon the research-based waste assessment studies already performed by UKAEA as part of EUROfusion demonstration fusion power plant ('DEMO') studies but with a more engineering and technological focus. The project is aimed at guiding future STEP R&D, for example to indicate if the current "low-activation" constraints can be relaxed or if further mitigation steps are required in the design of STEP. The decommissioning plans for STEP should become part of the design phase and this contra…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

NSG Environmental Limited£75kends (31 Mar 2020)

Details

What the buyer calls it
STEP WP9 Task 1 - Waste Sisposal and Decommissioning Optioneering
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
11 Jul 2019
Work ends
31 Mar 2020

Who the buyer named

Phil Perkins was the named contact on this notice.

phil.perkins@ukaea.uk