Skip to the main content
The Crier

STEP WP9 Task 2.3 - Design study for a UK-based accelerator-driven fusion-neutron irradiation facility to test materials

Your saved contracts

What the buyer wrote

STEP WP9 Task 2.3 - Design study for a UK-based accelerator-driven fusion-neutron irradiation facility to test materials

Details

What the buyer calls it
STEP WP9 Task 2.3 - Design study for a UK-based accelerator-driven fusion-neutron irradiation facility to test materials
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
22 Nov 2019
Work ends
28 Feb 2020

Who the buyer named

Phil Perkins was the named contact on this notice.

phil.perkins@ukaea.uk