STEP WP9 Task 2.3 - Design study for a UK-based accelerator-driven fusion-neutron irradiation facility to test materials
What the buyer wrote
STEP WP9 Task 2.3 - Design study for a UK-based accelerator-driven fusion-neutron irradiation facility to test materials
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- STEP WP9 Task 2.3 - Design study for a UK-based accelerator-driven fusion-neutron irradiation facility to test materials
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 22 Nov 2019
- Work ends
- 31 Mar 2020
Who the buyer named
Ben Oborne was the named contact on this notice.
