What the buyer wrote
Floor structure and surface repairs & additional works There are key areas of the existing floor structure that have completely failed and need immediate repair so the existing floor covering to the damaged areas will need to be taken up and set aside ready for re-use. The joists will then need to be assessed to determine the condition of each timber and replaced or splice repaired where required, The floors are split into the 3 areas that are identified as hall1, 2 & 3 as well as a small lobby leading to the disabled WC. There are existing holes that have been made into the floors at different points to allow the access . Where sections of the sub floor come into contact with external…
Details
- What the buyer calls it
- Stoney Stanton Village Hall - Flooring
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 31 Jan 2021
- Work ends
- 30 Apr 2021
- Kind of work
- Refurbishment and fit-out