Skip to the main content
The Crier

Stoney Stanton Village Hall - Flooring

Your saved contracts

What the buyer wrote

Floor structure and surface repairs & additional works There are key areas of the existing floor structure that have completely failed and need immediate repair so the existing floor covering to the damaged areas will need to be taken up and set aside ready for re-use. The joists will then need to be assessed to determine the condition of each timber and replaced or splice repaired where required, The floors are split into the 3 areas that are identified as hall1, 2 & 3 as well as a small lobby leading to the disabled WC. There are existing holes that have been made into the floors at different points to allow the access . Where sections of the sub floor come into contact with external…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Stoney Stanton Village Hall - Flooring
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
31 Jan 2021
Work ends
30 Apr 2021

Who the buyer named

Roz Ward was the named contact on this notice.

clerk@stoneystanton.org.uk