Strategic Flood Risk Assessment and Water Cycle Study
What the buyer wrote
Fenland District Council wishes to appoint a suitably qualified professional partner to undertake the water and flood risk related evidence bases for the emerging Fenland Local Plan, which will involve the preparation of two key evidence base documents. These are a: • Water Cycle Study; and • Strategic Flood Risk Assessment Level 1 (with the scope of the study increasing to Level 2 assessment, if or where required). Purpose of Assignment One: The aim of the Water Cycle Study (WCS) is to ensure that water infrastructure can be managed sustainability alongside the expected growth of the District and will not ultimately constrain the new Local Plan. It is expected that the professional …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Strategic Flood Risk Assessment and Water Cycle Study
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 30 Sep 2019
- Work ends
- 15 Jan 2021
Who the buyer named
Shaun Beales was the named contact on this notice.
