The stray current collection system for Supertram incorporates two measures to try and reduce the effects of current leaking from the rails, these two measures are:- • Earth drainage diodes at the substations, creating a directional connection between the substation earth mat and the negative busbar • Stray current collection system with associated drainage diodes. As a result of work looking at the renewal of the Supertram system SYPTE request consultancy advice in order to understand the work required to float the Supertram system in order that the system meets current best practice in relation to the management of stray current. Additional information: Full Specification, Invitati…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Solaris Technologies Ltd£14kends (1 Nov 2017)

Details

What the buyer calls it
Supertram Asset Review of Work to Float the System
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
31 Jul 2017
Work ends
1 Nov 2017

Who the buyer named

The buyer published a contact address on this notice.

tendering@sypte.co.uk