Skip to the main content
The Crier

Supply and Installation of a Replacement Back-Up Generator

Your saved contracts

What the buyer wrote

Transport for Greater Manchester requires a supplier for the supply and installation of a 650KVA replacement back-up generator for the main TfGM office in central Manchester. The supplier must also provide maintenance services. Further information and the full Tender pack can be found at https://www.the-chest.org.uk/cms/cms.nsf/vHomePage/fSection?OpenDocument

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Secure Power Ltd£153kends (29 Apr 2016)

Details

What the buyer calls it
Supply and Installation of a Replacement Back-Up Generator
How they are buying
The buyer did not say
Suitable for small firms
The buyer says yes. What that is worth
Work starts
31 Dec 2015
Work ends
29 Apr 2016

Who the buyer named

Imran Lobania was the named contact on this notice.

imran.lobania@tfgm.com