Supply and Installation of a Wind Turbine at Middlefields

Your saved contracts

What the buyer wrote

Award of contract to install a 900kW wind turbine at the Council's Middlefields site. This shall employ an Export Limit System (ELS), private wire and dump load to limit export to within the existing 80kW G59 agreement. Contractor will carry out on the required on site assessments, planning application and wind turbine supply, installation and maintenance.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Absolute Solar and Wind Ltd£1.4mends (31 Aug 2021)

Details

What the buyer calls it
Supply and Installation of a Wind Turbine at Middlefields
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
31 Aug 2018
Work ends
31 Aug 2021