What the buyer wrote
The supply of Complete Boiler Elements or individual tubes to the design of the boiler components currently installed. The bending of tube shall be in accordance with the requirements of BS EN 12952 and controlled to minimise distortion and/or thinning of the tube on the bend radius. All materials shall be manufactured and tested in accordance with PED 97/23/EC and BS EN 10216-2:2003 (seamless steel tubes for pressure purposes). All tube is seamless cold drawn precisions steel, manufactured and tested in accordance with BS 3059.
Details
- What the buyer calls it
- Supply and manipulation of Boiler Tubes
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Work starts
- 30 Jun 2017
- Work ends
- 31 May 2020
- Kind of work
- Heating, plumbing and mechanical
Who the buyer named
The buyer published a contact address on this notice.
