Skip to the main content
The Crier

Supply and manipulation of Boiler Tubes

LondonWasteservices
Your saved contracts

What the buyer wrote

The supply of Complete Boiler Elements or individual tubes to the design of the boiler components currently installed. The bending of tube shall be in accordance with the requirements of BS EN 12952 and controlled to minimise distortion and/or thinning of the tube on the bend radius. All materials shall be manufactured and tested in accordance with PED 97/23/EC and BS EN 10216-2:2003 (seamless steel tubes for pressure purposes). All tube is seamless cold drawn precisions steel, manufactured and tested in accordance with BS 3059.

Details

What the buyer calls it
Supply and manipulation of Boiler Tubes
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Work starts
30 Jun 2017
Work ends
31 May 2020

Who the buyer named

The buyer published a contact address on this notice.

vera.honey@londonwaste.co.uk