Skip to the main content
The Crier

Supply, Installation and Commissioning of replacement heating system for Torridge Pool

Your saved contracts

What the buyer wrote

The existing 12 (no.) 50 kW Concord mains gas boilers are nearing end of their useful life and require replacing. The overall aim is to provide a return on the Authority's investment, improve efficiency, remove end of life equipment and plant, improve controls, reduce duplication, reduce maintenance costs and requirements . The current 600 kW boiler capacity is subject to review by the contractor to ensure that the maximum demand from the facility can be met by any replacement system. The 600 kW is based on the current boiler sizes on site but may not represent an appropriate size and a smaller system is acceptable if it meets peak demand requirements. This should be clearly identified in an…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Supply, Installation and Commissioning of replacement heating system for Torridge Pool
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Suitable for small firms
The buyer says yes. What that is worth
Work starts
26 Feb 2018
Work ends
30 Mar 2018

Who the buyer named

The buyer published a contact address on this notice.

tenders@torridge.gov.uk