What the buyer wrote
The Council require one Biomass Suppliers List (BSL) registered Contractor to supply biomass wood chips to the following Council buildings during heating season which runs 01st October until 31st March. On occasion the Council may have requirements outside these months. Quality Requirements: Biomass Wood chips must meet the following specification: • Conform to EN14961-1 P45A • Chip size to be between 8mm and 45mm, less than or equal to 8% to be composed of fines and within the course fraction less than 6% shall exceed 63 mm, and a maximum of 3.5 % shall exceed 100 mm none shall exceed 120mm • Moisture content to be less than 30%
Details
- What the buyer calls it
- Supply of Biomass Wood Chips
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 30 Sep 2018
- Work ends
- 30 Sep 2019
Who the buyer named
Emma Prest was the named contact on this notice.
