What the buyer wrote
Supply, deliver and place, using appropriate concrete pump, up to 1,900 cubic metres of C10 Foamed Concrete over a maximum distance of 20m at a maximum rate of 160 cubic metres per day. Suppliers to quote a rate/cubic metre. Supply, deliver and place, using appropriate concrete pump, up to 100 cubic metres of C25/30 Concrete to each of two sites over a maximum distance of 30m, each site to be completed in a single pour. Suppliers to quote a rate/cubic metre. Undertake 3 sets of slump and cube testing (3 cubes per test) during placing of the foamed concrete and concrete.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Supply of Concrete
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Where
- in the East Midlands
- Kind of work
- Construction
Who the buyer named
Helen Baldwin was the named contact on this notice.