What the buyer wrote
GENERAL DESCRIPTION The survey is to include the extents of the 3 Bridge areas outlined on the plans provided. 'I have attached a drawing showing the 3 bridges I need surveying. I need the survey to be about 10m past each of the 4 sides/ends of the bridges, as I need to do works to the embankment. I need high detail under and along the sides of the bridges and along the embankments to enable me to do some design drawings. I also want 4 sections, 1 along the middle of each bridge, and 1 down each side of the bridge. And then one section along the middle of the river running the way of the water.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Survey of 3 bridges
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 22 Jul 2019
- Work ends
- 31 Jul 2019
Who the buyer named
Mr Aaron John was the named contact on this notice.
