Skip to the main content
The Crier

T322 NIEN Transmission Substation Turnkey (Amended)

Northern Ireland Electricity Networks LimitedNorthern Irelandworksabove thresholdFramework
Your saved contracts

What the buyer wrote

It is proposed to establish a Multi-Party Framework which will consist of two lots, • Lot 1 will consist of larger scale substations with a range between 110 – 400kV and an estimated cost range between £20 to £100m. • Lot 2 will consist of medium scale substations with a range between 33 – 275kV and an estimated cost range between £1 - £20m • The scope of works to be procured will include predominantly substation works including turnkey electrical, mechanical, civils and enabling works, with the inclusion of local overhead lines and cables within the curtilage of the site. • NIEN wish to retain the flexibility for each lot to utilise both Design and Build (D&B) and Engineering Procureme…

Read all of it on Find a Tender →

Details

What the buyer calls it
T322 NIEN Transmission Substation Turnkey (Amended)
How they are buying
Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
Type
works
Lots
2
Framework
Yes: joining it lets you bid for call-offs without a new tender each time
Where
in Northern Ireland

Asking a question

The buyer published a contact address on this notice. Questions closed on 30 Apr 2025, 12:00 BST.

Angela.Hutton@nienetworks.co.uk

Above threshold you will be asked for a PPON and a share code when you bid. Getting one takes about half an hour, once.

You submit through the buyer’s own system: Jaggaer.