T322 NIEN Transmission Substation Turnkey (Amended)
What the buyer wrote
It is proposed to establish a Multi-Party Framework which will consist of two lots, • Lot 1 will consist of larger scale substations with a range between 110 – 400kV and an estimated cost range between £20 to £100m. • Lot 2 will consist of medium scale substations with a range between 33 – 275kV and an estimated cost range between £1 - £20m • The scope of works to be procured will include predominantly substation works including turnkey electrical, mechanical, civils and enabling works, with the inclusion of local overhead lines and cables within the curtilage of the site. • NIEN wish to retain the flexibility for each lot to utilise both Design and Build (D&B) and Engineering Procureme…
Details
- What the buyer calls it
- T322 NIEN Transmission Substation Turnkey (Amended)
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- works
- Lots
- 2
- Framework
- Yes: joining it lets you bid for call-offs without a new tender each time
- Where
- in Northern Ireland
Asking a question
The buyer published a contact address on this notice. Questions closed on 30 Apr 2025, 12:00 BST.
Angela.Hutton@nienetworks.co.uk
Above threshold you will be asked for a PPON and a share code when you bid. Getting one takes about half an hour, once.
You submit through the buyer’s own system: Jaggaer.