Tamar Bridge Kerb Unit and Deck Waterproofing Remedial Work
What the buyer wrote
With the aim being to undertake work during the Spring of 2019, this preferred start date is intended to allow for all kerb fixings and corrosion remedial works to be completed ahead of separate resurfacing work planned for 2020/21. Following close monitoring of the existing 7200 Kerb Units ( 4 studs per kerb unit) and the associated Deck Waterproofing System over recent years, since their initial installation, as part of the strengthening and widening scheme around the turn of the century, and following the identification of serious deterioration, a number of technical solutions were developed and tested and the preferred solution and range of activities required going forward is described …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Tamar Bridge Kerb Unit and Deck Waterproofing Remedial Work
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 31 Mar 2019
- Work ends
- 31 Mar 2020
Who the buyer named
Robert Buckley was the named contact on this notice.