Tanton Bridge Widening Works

Your saved contracts

What the buyer wrote

Tanton Bridge widening works require the existing downstream elevation (parapets, spandrels, wingwalls, copings, pilasters) of the bridge to be dismantled and the arch barrel extended by approx. 5.8m. The elevation is then to be rebuilt on the new line. River re-alignment is also needed. The works will also include TM works, Temp/scaffold works, arch support, Sheet piles, new RC foundations, dismantle/rebuilding downstream walls, remove/install new road resurfacing, new drainage gulley, new curb line, new verge line, concrete mass infill's and footstep construction.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

PBS Construction (NE) Ltd£534.9kends (7 Jun 2020)

Details

What the buyer calls it
Tanton Bridge Widening Works
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
20 Jan 2020
Work ends
7 Jun 2020

Who the buyer named

Alison Dickinson was the named contact on this notice.