Tanton Bridge widening works require the existing downstream elevation (parapets, spandrels, wingwalls, copings, pilasters) of the bridge to be dismantled and the arch barrel extended by approx. 5.8m. The elevation is then to be rebuilt on the new line. River re-alignment is also needed. The works will also include TM works, Temp/scaffold works, arch support, Sheet piles, new RC foundations, dismantle/rebuilding downstream walls, remove/install new road resurfacing, new drainage gulley, new curb line, new verge line, concrete mass infill's and footstep construction.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Tanton Bridge Widening Works
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 20 Jan 2020
- Work ends
- 7 Jun 2020