Skip to the main content
The Crier

TC1029 - Hyde Road (A57) Pinch Point Widening Scheme

Your saved contracts

What the buyer wrote

Manchester City Council is prepared to receive tenders for Hyde Road (A57) Pinch Point Widening Scheme. The A57 Hyde Road is a strategically important trunk road which forms part of the main arterial route network in and out of Manchester City Centre. Hyde Road is a link between the junctions of the M60 and M67 motorways to the east and Ardwick Green South (A6) to the west. For the majority of its length Hyde Road is a dual carriageway in both directions. However, between Far Lane and Wall Way the dual carriageway narrows to a single carriageway. In order to reduce congestion on Hyde Road, the scheme comprises the widening of Hyde Road (A57) from 2 lanes to 4 lanes between Far Lane a…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Eric Wright Civil Engineering Ltd£2.2mends (2 Nov 2020)

Details

What the buyer calls it
TC1029 - Hyde Road (A57) Pinch Point Widening Scheme
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
1 Nov 2019
Work ends
2 Nov 2020

Who the buyer named

Stephen Polese was the named contact on this notice.

s.polese@manchester.gov.uk