TC826 Final Survey , Design ,Supply , Installation and Connection of Solar PV (250kw) at Parrs Wood High School, Manchester
What the buyer wrote
<b>Objective </b> The client's objective is to install a 250 kW solar PV array on the roof at Parrs Wood High School, Didsbury. In order to minimise impact, intrusive works will need to be planned around the building's current operational usage and users in advance of mobilisation. Modules installed shall comply with IEC61215 and have a 25 year minimum power warranty. <b>Requirements</b> · Installation will comply with Part 43 of the Installation of Non-domestic Microgeneration Equipment Class A of the Town and Country Planning (General Permitted Development) (Amendment) (England) Order 2012. · A performance rate guarantee of 80% minimum with a preference of 85% · Installation must be compl…
Details
- What the buyer calls it
- TC826 Final Survey , Design ,Supply , Installation and Connection of Solar PV (250kw) at Parrs Wood High School, Manchester
- How they are buying
- The buyer did not say
- Type
- works
- Work starts
- 4 Oct 2015
- Work ends
- 31 Dec 2015
- Kind of work
- Renewables and building decarbonisation