Skip to the main content
The Crier

Temple Quay, Plot 3 Infrastructure Works

Your saved contracts

What the buyer wrote

The Plot 3 Infrastructure works around Temple Quay being approximately 3,000m2 of pavement construction, generally comprise of stone capping with tarmac sub-base, sand and block paving, and associated works will include the following components: • Earthworks • Extension of Friary to Meads Reach Bridge o This work would comprise the extension of Friary as a two carriageway road east of Isambard Walk to Meads Reach Bridge. o As part of this work the footway to the north of Friary (adjacent to the Plot 3 development site) would be extended to 6 metres in width, as will the footway to the south (adjacent to the station) would be made 8.5 metres in width and include the provision of 6 ne…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Dyer & Butler Ltd£1.2mends (30 Sep 2017)

Details

What the buyer calls it
Temple Quay, Plot 3 Infrastructure Works
How they are buying
The buyer did not say
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
1 Mar 2016
Work ends
30 Sep 2017

Who the buyer named

Bob Arrowsmith, WYG was the named contact on this notice.

mail@homesandcommunities.co.uk