What the buyer wrote
The Plot 3 Infrastructure works around Temple Quay being approximately 3,000m2 of pavement construction, generally comprise of stone capping with tarmac sub-base, sand and block paving, and associated works will include the following components: • Earthworks • Extension of Friary to Meads Reach Bridge o This work would comprise the extension of Friary as a two carriageway road east of Isambard Walk to Meads Reach Bridge. o As part of this work the footway to the north of Friary (adjacent to the Plot 3 development site) would be extended to 6 metres in width, as will the footway to the south (adjacent to the station) would be made 8.5 metres in width and include the provision of 6 ne…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Temple Quay, Plot 3 Infrastructure Works
- How they are buying
- The buyer did not say
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Mar 2016
- Work ends
- 30 Sep 2017
- Kind of work
- Civil engineering and groundworks
Who the buyer named
Bob Arrowsmith, WYG was the named contact on this notice.