What the buyer wrote
Goldsmiths University of London, require a temporary building to be installed on the site of the demolished St James Halls Block 3 building. This temporary building will be used to house students from art and design courses and will preferably be a two story building with an open plan room on each floor. We plan to keep the building for up to 4-5 years and would be interested to see the difference in price for leasing for that period or for the option of purchasing. The building that previously occupied the site was demolished in 2014 the existing foundations are still in place however dependant on the new footprint these may have to be adapted. As part of your price please allow for sit…
Details
- What the buyer calls it
- Temporary Buildings Supply & Install
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 9 Aug 2015
- Work ends
- 18 Sep 2015
- Kind of work
- Construction, Grounds maintenance and landscaping
Who the buyer named
Rosie Hale was the named contact on this notice.
