What the buyer wrote
TfGM required a supplier for the replacement of the surface and drainage system to the Horwich Parkway (HPW) footbridge, stairs and ramps in Bolton, Greater Manchester. The works include the removal of the existing surface and drainage system, supply and installation of the new systems and labour costs including railway safety critical staff. This will be a short term contract and it will use NEC3 contract terms.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- TfGM Horwich Parkway Bridge Repairs
- How they are buying
- Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
- Where
- in the North West
Who the buyer named
The buyer published a contact address on this notice.
