Skip to the main content
The Crier

The Construction of Sustainable Drainage Systems (SuDS) in Schools (London Borough of Sutton)

Your saved contracts

What the buyer wrote

The London Borough of Sutton, together with the South East Rivers Trust, is undertaking a 'Sutton SuDS in Schools' project. The Carshalton / Hackbridge area of the borough is in a Critical Drainage Area and to alleviate surface water flooding, the project will install SuDS features into seven local schools, to attenuate surface runoff. The project aims are: 1. Reduce flood risk to 27 properties in the downstream catchment. 2. Eliminate or reduce on-site flooding in playgrounds in some of the schools in the project, as this flooding impacts learning and the school day. 3. The SuDS features installed in the schools will bring educational or recreational benefits meaning school children…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Initial Systems Limited£421.8kends (30 Aug 2019)

Details

What the buyer calls it
The Construction of Sustainable Drainage Systems (SuDS) in Schools (London Borough of Sutton)
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
24 Jun 2019
Work ends
30 Aug 2019

Who the buyer named

Sharon King-Holmes was the named contact on this notice.

sharon.king-holmes@sutton.gov.uk