The Grimsby Institute - Installation of Cooling to 2nd Floor, B Block
What the buyer wrote
Installation of cooling to 2nd Floor south of B Block on our Nuns Corner Site, Grimsby. Scope, location and technical requirements detailed within Specification, Preliminaries and drawings associated with this scheme, which will form the basis of the Contract. Associated electrical works and installation of suspended ceiling to be procured and managed separately to this contract although your full co-operation in integrating and co-ordinating the work is required An asbestos survey and associated strip out will be undertaken prior to the Main Contract commencing Additional information: Please apply for this tender through In-Tend E-procurement website.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- The Grimsby Institute - Installation of Cooling to 2nd Floor, B Block
- How they are buying
- The buyer did not say
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 23 Jun 2016
- Work ends
- 12 Aug 2016