The options for deploying industrial carbon capture, utilisation and storage at sites where linking to a carbon dioxide transport and storage infrastructure may not be possible.

Your saved contracts

What the buyer wrote

The final date and time for the submission of bids is Wednesday 3rd April 2019 at 14:00 GMT. DO NOT apply directly to the buyer. All tender information MUST be submitted through the CCS eSourcing Portal. Brief Description of Requirement Work package 1: Examine the challenges to deployment. Objective: Identify and examine the unique challenges associated with deploying carbon capture, usage and storage at industrial sites where a carbon dioxide transport and storage infrastructure network may not be easily developed. Work package 2: Define the range of options for deployment. Objective: Document the high-level options available for deploying industrial CCUS industrial sites w…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Element Energy Limited£27.8kends (19 Jul 2019)

Details

What the buyer calls it
The options for deploying industrial carbon capture, utilisation and storage at sites where linking to a carbon dioxide transport and storage infrastructure may not be possible.
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
21 Apr 2019
Work ends
19 Jul 2019

Who the buyer named

The buyer published a contact address on this notice.