The production of As Fitted record drawings of the Medical Gas Pipeline Systems at Kettering General Hospital.
What the buyer wrote
A requirement of HTM02-01 and the Pressure System Safety Regulations is that the estates department should have accurate and up to date drawings of the MGPS showing main sections and branches, departments served, control valves, terminal units and alarm systems for each medical gas service. A schematic diagram of the installation should also be provided. In addition to this each isolating valve and AVSU should be individually identified by a unique reference number. The appropriate reference number, corresponding to that shown on the drawings, should be displayed at or on each isolating valve. The drawing should indicate the type and make of terminal units. The Trust therefore requires fix…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- The production of As Fitted record drawings of the Medical Gas Pipeline Systems at Kettering General Hospital.
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 2 Nov 2020
- Work ends
- 30 Jun 2021
Who the buyer named
Gail Thorburn was the named contact on this notice.
