the Provision for Design, Supply and Installation of a Primary Chilled Water System For Building 30
What the buyer wrote
The University of Southampton is seeking to appoint a Contractor to deliver Primary Chilled Water System Remedial Works within Building 30 located on the Highfield Campus as outlined below: Building 30 is currently served by a chilled water system which has 2 no. air cooled screw chillers, manufactured by Trane and located on the roof (level 7). The associated primary pumps and controls for this system are located in the level 6 plant room below the chillers. The existing roof mounted chiller plant and the associated primary distribution system shall be isolated, drained down and removed from the roof and the level 6 plant room. Design, supply and install new packaged air cooled chiller pl…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- the Provision for Design, Supply and Installation of a Primary Chilled Water System For Building 30
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 20 Apr 2019
- Work ends
- 31 May 2019
- Kind of work
- Logistics, courier and distribution
Who the buyer named