The Provision of UCL TM44 Air Conditioning Inspections
What the buyer wrote
3.1.1 The Energy Performance of Buildings (England and Wales) Regulations require regular inspection of air conditioning systems of an effective rated output of more than 12 kW The intent for the inspections and subsequent reporting is designed to improve efficiency, reduce energy consumption, operating costs and carbon emissions associated with air conditioning and ventilation systems. Only air conditioning systems with an effective rated output of more than 12kW are to be included in the scope of works. This will include systems consisting of individual units which are less than 12kW but whose combined effective rated output is more than 12kW. The effective rated output is the maximum c…
Details
- What the buyer calls it
- The Provision of UCL TM44 Air Conditioning Inspections
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 30 Jun 2019
- Work ends
- 30 Jun 2020
Who the buyer named
Dave Wilder was the named contact on this notice.
