The Royal Marsden Hospital The Oak Cancer Centre
What the buyer wrote
The Works shall be known as The Oak Cancer Centre. The building comprises six levels in total (Lower Ground, Ground and Levels 1 to 4). The design proposes a reinforced concrete frame construction to Lower Ground, Ground and Levels 1 to 3 inclusive with reinforced concrete shear walls and steel frame to Level 4. There is a terrace at roof level (Level 4) with a pergola over and other external terraces. The roof is a mix of reinforced concrete and lightweight steel deck, insulated and predominantly with a gravel ballast finish, some paving and some elements of green (sedum) roof . There are sawtooth rooflights over the atria and a skylight over the office area. The building will be highly ser…
Details
- What the buyer calls it
- The Royal Marsden Hospital The Oak Cancer Centre
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Work starts
- 27 Jul 2020
- Work ends
- 8 Aug 2022
- Kind of work
- Construction
Who the buyer named