The Supply of Electric Vehicle Charging Infrastructure and Associated Services 2025-2040
What the buyer wrote
The purpose of this ITT is to appoint a single Charge Point Operator, to deliver Bedford Borough Council's requirements for a "full turnkey" solution to supply, install, connect, commission, operate and maintain a network of charge points on behalf of the Council across the Borough. We expect the winning bidder to deliver a minimum of 512 additional new Electric Vehicle "sockets" (as defined in the Contract at Schedule 4), of which: • A minimum of 256 sockets to be located at our required sites as set out in Portfolios 1, 2 and 3 (see section 2.2.3 in this document for further information), with our £1.01m subsidy to support installations. • Further to this we would like the operator to ma…
Details
- What the buyer calls it
- The Supply of Electric Vehicle Charging Infrastructure and Associated Services 2025-2040
- How they are buying
- The buyer did not say
- Type
- services
- Where
- in the East of England
- Kind of work
- Renewables and building decarbonisation
Who the buyer named
Leon Clancy was the named contact on this notice.
