The Wallace Collection - Fire Engineer (Signed NDA request only)
What the buyer wrote
The Wallace Collection (TWC) is seeking to appoint a Fire Engineer for a significant re-development project as part of TWC’s Masterplan. The completion of a full RIBA Stage 4 design is required, along with RIBA Stage 5/6/7 services. Tenderers must demonstrate sufficient capability to support the procurement and delivery of the project at the Wallace Collection in Westminster, London. TWC requires a Fire Engineer with extensive experience in fire safety design that ensures compliance with resilience, fire, and life safety regulations and guidance, specifically within existing buildings in a historical context.
Details
- What the buyer calls it
- The Wallace Collection - Fire Engineer (Signed NDA request only)
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Kind of work
- Architecture and design
Who the buyer named
Paul Mullins was the named contact on this notice. Questions closed on 11 Jul 2025, 17:00 BST.
