North Yorkshire County Council wishes to appoint a contractor to carry out the Infill of Thormanby Bridge. Contaminated Material to be buried under the concrete as a result. It is anticipated that the works will be carried out between 28/10/2019 - 08/11/2019. Works will consist of: - Construction of Block Wall on East Face up to the start of the arch - C4 Foam Concrete to be tubed into the arch from above, up to the top of the breezeblock wall. - Two Way Signals on the A19 at off peak times

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Hinko Construction Limited£36kends (8 Nov 2019)

Details

What the buyer calls it
Thormanby Bridge Concrete Infill
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
28 Oct 2019
Work ends
8 Nov 2019

Who the buyer named

Tim Wood was the named contact on this notice.