Skip to the main content
The Crier

Toilets

Your saved contracts

What the buyer wrote

The works include the full strip-out, refurbishment, and reinstallation of sanitary fittings, finishes, and associated building and plumbing works to the existing toilet area. 1. Strip Out and Preparation a. Strip out and remove existing toilet, sink, and associated fittings. b. Carry out full demolition/soft strip of redundant fixtures, finishes, and pipework as required. c. Remove existing internal door and door furniture. d. Dispose of all waste materials in accordance with site waste management and environmental regulations. e. Make good all disturbed areas to a sound and even finish ready for decoration. 2. Windows a. Make good 2 no. existing windows, including repair of frames, cleani…

Read all of it on Find a Tender →

Bid for this and lost? There is a short window in which the decision can be questioned.

Details

What the buyer calls it
Toilets
How they are buying
The buyer did not say
Where
in London

Who the buyer named

Ben Higgs was the named contact on this notice.

support@multiquote.com