Top Deck Waterproofing Renewal at Avenue Road Multi-Storey Car Park
What the buyer wrote
Avenue Road Multi-Story Car Park is a busy town centre multi-storey car park on five levels. It comprises two sections, built at different times and connected together by access ramps. The waterproofing and wearing layers to the top deck of one section is life expired and is failing. The area has been patched but is now in a condition that complete removal, preparation and renewal is required. It is proposed to use a PMMA-based system, applied in one operation using products supplied as a complete system by a single manufacturer in accordance with the performance specification detailed in Section 2 of the Specification. Whichever system is used, it will be applied by a contractor …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Top Deck Waterproofing Renewal at Avenue Road Multi-Storey Car Park
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 25 Feb 2018
- Work ends
- 25 May 2018
Who the buyer named
Strategic Procurement Team was the named contact on this notice.
