Track Systems Lots Procurement for Phase One and Phase 2a of the HS2 Project
What the buyer wrote
High Speed Two (HS2) Limited ('HS2 Ltd') is the body responsible for developing and promoting the new high-speed railway system known as High Speed Two (HS2). HS2 will initially run between London and Birmingham (Phase 1) but will subsequently be extended to link Birmingham to Crewe (Phase 2a) and Crewe to Manchester and the West Midlands to Leeds (Phase 2b). (Phase 2a and 2b are subject to HS2 Ltd achieving Royal Assent). The Railway Systems tranche of work incorporates critical disciplines for the HS2 Project, including without limitation the design, construction, commissioning and testing of track, overhead catenary, lineside M & E & tunnels, power, signalling and communications. This …
Details
- What the buyer calls it
- Track Systems Lots Procurement for Phase One and Phase 2a of the HS2 Project
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 18 Apr 2022
- Work ends
- 14 Aug 2030
Who the buyer named
Pola Walecka was the named contact on this notice.
