Skip to the main content
The Crier

Traffic Control System - Creighton Road Corridor

Your saved contracts

What the buyer wrote

Design Considerations Location Creighton/Greatmoor Road is an existing private access road to the FCC Energy from Waste (EfW) plant from the A41, as indicated on the location plan below. Traffic flows The objective of the traffic signalling system design/installation is to control HGV vehicles using Creighton/Greatmoor Road so that the capacity can be increased to accommodate an EK requirement of an additional 100no. HS2 HGV's per day (peak) over the FCC HGV planning limit (600no. per day) - see traffic modelling reports referenced in item 1.1. In addition, there is a requirement to accommodate a relatively small volume of FCC/EK LGV vehicles th…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Traffic Control System - Creighton Road Corridor
How they are buying
Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
Type
services
Work starts
27 Aug 2020
Work ends
27 Dec 2024

Who the buyer named

Chris Read was the named contact on this notice.

supplychainenquiries@ekfb.com