Tyne Diffuse Investigation and Mitigation Methods
What the buyer wrote
This contract is to provide necessary services required to establish a programme of work which will identify areas of diffuse pollution that would benefit from 'green' engineering mitigation measures. The design and installation of methods to reduce any water runoff, prevent the erosion of the former spoil heaps and stop the mobilisation of contaminated sediment from entering the watercourse, thereby improving water quality standards in the Tyne catchment and at the Port of Tyne
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Tyne Diffuse Investigation and Mitigation Methods
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Where
- in the North East
- Kind of work
- Water, drainage and flood management
Who the buyer named
Helen Baldwin was the named contact on this notice.
