UK SBS FM160122 Design, Supply and Installation of 50kWp Photovoltaic Array System
What the buyer wrote
Brief Description of the Works To support the work undertaken at CEH Wallingford and to help the organisation achieve its environmental targets this contract is for the complete design, supply, installation and commissioning of a photovoltaic array system in accordance with the following information. The system should be designed to maximise energy generation from the available roof area for a 50kWp system. Estimated energy production should be clearly stated in your tender return along with estimated electricity savings, and YOY analysis with payback analysis should be based upon a unit cost rate for Year 1 of £0.106/kWh and 100% onsite use of energy generation. Savings shall be c…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- UK SBS FM160122 Design, Supply and Installation of 50kWp Photovoltaic Array System
- How they are buying
- The buyer did not say
- Type
- goods
- Work starts
- 12 Sep 2016
- Work ends
- 13 Nov 2016
- Kind of work
- Renewables and building decarbonisation
Who the buyer named
Rebecca Fish was the named contact on this notice.
