UK SBS FM17080 CEH Edinburgh External Plantroom Replacement Boiler Plant
What the buyer wrote
The pre-construction health and safety plan, specification and drawings set out the requirements for contractors undertaking the decommissioning of existing plant, supply & installation, commissioning and handover of new boilers and mechanical services in accordance with the standards and legislation set out in the documents and in line with the background set out below: The existing boilers serve the 1974 building, Cairngorm Wing and the primary heating source to the glasshouses. Due to the nature research undertaken the boilers also need to be operational 24/7 365 days per year. Several of the existing boiler modules have developed significant faults including cracked casings, heat e…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- UK SBS FM17080 CEH Edinburgh External Plantroom Replacement Boiler Plant
- How they are buying
- The buyer did not say
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 9 Jul 2017
- Work ends
- 10 Oct 2017