UK SBS PR16036 Fit Out Main Contractor (Design and Build) of UK Pavilion for Astana Expo 2017
What the buyer wrote
Introduction: UKTI are seeking to appoint a specialist contractor for the technical design (RIBA Stage 4), fabrication, construction and installation of the UK Pavilion at the Astana EXPO 2017 in Astana, Kazakhstan. The successful contractor shall act as Main Contractor and provide a single point of contract for the Design & Build of the UK Pavilion within the Basebuild Shell & Core (by others). UKTI are procuring the development of the design to RIBA Stage 3 as a separate exercise. This Works contract being procured under a two stage procurement procedure involving a Pre-Qualification Questionnaire to shortlist bidders (PQQ Stage) and an Invitation To Tender to the shortlisted bidders …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- UK SBS PR16036 Fit Out Main Contractor (Design and Build) of UK Pavilion for Astana Expo 2017
- How they are buying
- The buyer did not say
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 4 Oct 2016
- Work ends
- 20 Feb 2018
Who the buyer named
Rebecca Fish was the named contact on this notice.