Skip to the main content
The Crier

UK SBS PR16080 New ISIS linear accelerator (LINAC) vessel - Tank IV

Your saved contracts

What the buyer wrote

A new ISIS Linear accelerator (LINAC) vessel is required to replace the current aged one. Tank IV is the last section of the ISIS normal conducting drift tube linear accelerator. It operates whilst under vacuum. All components will be cleaned and conform to ISIS vacuum specification. The 12m long tank will consist of six 2m long by 1m diameter vessels bolted together. The new tank will be a direct replacement, as the frequency is dictated by the ISIS machine. For ease of maintenance and safe radiation working levels side hatches will be added to aid drift tube replacement, should the need arise in the future. The main requirements are: - The Tank needs to be a direct dimensional copy o…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Schelde Exotech bv£731.8kends (6 Jun 2018)

Details

What the buyer calls it
UK SBS PR16080 New ISIS linear accelerator (LINAC) vessel - Tank IV
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
goods
Suitable for small firms
The buyer says yes. What that is worth
Work starts
4 Jun 2017
Work ends
6 Jun 2018

Who the buyer named

Geoff Bath was the named contact on this notice.

geoff.bath@uksbs.co.uk